Recent work

Solar detach & reset projects

Residential and commercial arrays across the Phoenix metro — tile, shingle, foam, TPO membrane and steel carport canopies. Each job lists the scope, the phase sequence, and what the roofing partner walked away with.

Crew removing solar panels from a red clay tile roof on an Arcadia ranch home in Phoenix, Arizona

Arcadia, Phoenix · Residential · 24 panels

24-panel detach & reset on a 1970s Arcadia ranch

Tile-to-tile re-roof on a mid-century Arcadia ranch. Panels came off ahead of tear-off and went back on the same week.

Technician reinstalling solar panels on a new asphalt shingle roof in Desert Ridge, Phoenix, Arizona

Desert Ridge, Phoenix · Residential · 32 panels

32-panel reset over a new shingle roof in Desert Ridge

Tight three-day turn on a Desert Ridge production home so the homeowner never lost a full billing cycle of production.

Solar array on a flat foam roof section of a Scottsdale home with desert mountains behind it

McCormick Ranch, Scottsdale · Residential · 18 panels

18-panel detach on a McCormick Ranch foam roof

Foam recoat on a low-slope Scottsdale roof where the ballast footings had to come off clean so the coating could run uninterrupted.

Crew removing rows of solar panels from a large commercial TPO flat roof in Tempe, Arizona

Warner Ranch, Tempe · Commercial · 96 panels

96-panel commercial detach & reset in Warner Ranch

Multi-tenant office building in Tempe. The array had to come off in phases so the roofer could keep half the deck watertight at all times.

Concrete tile re-roof in progress in Chandler, Arizona with solar panels stacked and wrapped in the driveway

Ocotillo, Chandler · Residential · 28 panels

28-panel detach ahead of a concrete tile re-roof in Ocotillo

Chandler lake-community home where broken tile counts mattered — the roofer needed a hard number before ordering replacement tile.

Two technicians labeling and coiling solar wiring on a tile rooftop in Gilbert, Arizona

Val Vista Lakes, Gilbert · Residential · 22 panels

22-panel reset with full wiring re-terminate in Val Vista Lakes

Older array in Gilbert with brittle wire management. Everything got labeled, re-run, and bonded properly on the way back up.

Solar carport array over a commercial parking lot in Glendale, Arizona with a lift removing panels

Arrowhead Ranch, Glendale · Commercial · 40 panels

40-panel carport array detach in Arrowhead Ranch

Retail center carport in Glendale needing canopy re-decking. Work ran off-hours so parking stayed open through business hours.

Crew member torquing rail bolts on solar panels being reset on a new white TPO roof in Peoria, Arizona

Vistancia, Peoria · Residential · 30 panels

30-panel reset on a new TPO section in Vistancia

Mixed tile and low-slope roof in Peoria. The low-slope section got a new TPO membrane and a non-penetrating reset.